A variety of stuff going on.
|
Sewing a woobie for Mom |
We're working not the baseboards in the house. This seems to be taking an inordinate amount of time. It was a bit tricky to design as we need to cover the seam between the rough concrete of the footer and the smooth concrete of the floor. When we installed the walls, we centered them on the sill and that left a seam about 2 inches past the drywall that was really unsightly. We figured out a 3 layer baseboard treatment that we liked and we're now in the process of routing the boards, staining, and installing.
|
Many, many linear feet of trim |
It hasn't been all serious work - Chris decided to try his hand at a stone arch.
|
Hmmm |
|
Cute, but looks a bit haphazard |
|
Trying to fix things |
Unfortunately the arch didn't hold and collapsed into the ditch. He's now on attempt number 2.